Another update on this catamaran refit, the hardtop is structurally built with new foam/epoxy front supports and inbuilt bolt rope track for clears. All wiring has been run inside the structure for lights and solar panels. The main sheet system has been moved onto the back of the hardtop with composite support posts glassed in place. New design epoxy davits have been fitted to the new duckboard to replace the old alloy rickety eye-sore that was there.
We are getting close to the finishing and painting stage externally with still plenty to do internally.
We’ll keep you posted on more progress.