The owner of this tidy Cruise Craft Outsider booked this boat in for a transom replacement but got a lot more than he bargained for! He asked us to check out a soft spot in the floor which lead to us finding that most of his internal hull structure was rotted. To avoid any doubt […]
Catamaran Eva Decking Pads – Eva Decking Oyster Cove NSW
We were asked to assist with this sailing catamaran that had been extended on the sterns with some machined Eva decking pads to finish the job off. This work consisted of making templates of the pads and layout design including a set of steps leading to the main decks. The steps were plywood finished in […]
Hamilton Launch!! Boat Modification Projects Medowie NSW
The moment has come at last, the Hamilton project was one of our larger and more exciting projects. For those who haven’t seen the earlier posts, this boat was lying in the owners backyard, and in a very sad way. The first task was to strip the boat down, removing the alloy cabintop, inboard diesel, […]
Trailcraft Completed – Boat Resprays Port Stephens NSW
Following on from an earlier post, this project has now been completed and ready to go in for the engine and electrical work. The engine although old is in good mechanical condition as advised by the owner, so we decided to paint the engine cover to match the grey side panels which worked in really […]