This 6m Cruise Craft was in like-new condition however the keel forefoot had caught on something and created some nasty damage. A strip about a meter long had been flattened off requiring glassing to build back up. We suggested a ‘Keel-guard’ strip be applied over this area to protect this area from future damage. Although this strip would cover the repair the owner wanted it finished in colour-matched 2 pack. To do this job the boat was put onto work stands for access and then returned to the trailer once complete. Another job requested by the owner was to replace a couple of docking lights mounted each side of the bowsprit which were old and peeling.