Following on from a previous post of this job where we refitted the galley benchtop, sinks and taps, we have since replaced the old kero stove with a new gimbaled stove/oven unit. The first job was to create a gas locker in the cockpit and run gas lines to the galley. This in itself involved a lot of work and the size of the locker dictated the size and style of the gas bottles. Fitting the new stove required the cabinet to be cut larger and then new teak trims remade and fitted. The gas fitter did the final installation and connection.