A 19ft Seafarer getting a transom replacement and a custom in-built bait well incorporated into the wet well. All the work was done using epoxy for it’s super high strength and durability. The bait well was made on the bench and then fitted into the boat with all plumbing. Upon request the new transom was fitted with larger hull drain fittings.