A professional fisherman requested this hull re-fitted with a new wet-deck, bulkhead and front locker. The hull was solid FRP and some modification was needed to gain support for the new floor. All new parts were epoxy coated and bonded/glassed with epoxy. All finishing was done using 2 pack PU for long life.

