This Stejcraft was a unique transom replacement job working around the hull extensions each side. Access was difficult and the new portion of the transom needed to be blended into the radius each side. The job was all done using epoxy for the bonding and glassing. A couple of extras were larger hull drains and and a reinforced tie-down fitting.
You are here: Home / Transom Replacements / Stejcraft Transom Replacement – Quality Boat Repairs Newcastle